Mumbai Metro Line-3: Initial Drive of Tunneling Activities in Package 04

Authors

  • Ojas Vora Student, Assistant Professor,Rizvi College of Engineering, Mumbai University, Maharashtra, India
  • Avinash More Assistant Professor, Rizvi College of Engineering, Mumbai University, Maharashtra, India
  • E. Thinakaran Assistant Professor, Rizvi College of Engineering, Mumbai University, Maharashtra, India

DOI:

https://doi.org/10.51983/ajeat-2018.7.1.881

Keywords:

Mumbai Metro Line-3,, Package 04, Tunneling Activities, Environmental Impacts

Abstract

Mumbai Metro Line -3, indicated as the Colaba-Bandra-Seepz line, is a part of the metro system of the city and is the first underground covering, 33.50km metro line in Mumbai, India. The study area of the tunnel line is between Naya Nagar tunnellaunching shaft and Siddhivinayak Metro station, which is part of Package 04. The distance between these two locations is about 3.6km. The description about the initial drive of tunneling activities, which involves Installation of Piles, Anchoring, lowering of TBM(Tunnel Boring Machine), Mining, Shoving, Mucking, Ring Building and Grouting has been detailed in accordance with the site condition. From the environmental point of view, the problems such as deforestation and flooding have been discussed along with the remedial action.

References

ASTM C938-10, "Standard Practice for Proportioning Grout Mixtures for Preplaced-Aggregate Concrete," ASTM Standards International, United States of America, pp. 1-4, 2010.

ASTM C939-02, "Standard Test Method for Flow of Grout for Preplaced-Aggregate Concrete (Flow Cone Method)," ASTM Standards International, United States of America, pp. 1-3, 2002.

ASTM C940-98a, "Standard Test Method for Expansion and Bleeding of Freshly Mixed Grouts for Preplaced-Aggregate Concrete in Laboratory," ASTM Standards International, United States of America, pp. 1-2, 1998.

A. D. Barley, D. A. Bruce, M. E. C. Bruce, and J. C. Lang, "High Capacity and Fully Removable Soil Anchors," in 27th Annual Conference on Deep Foundations, San Diego, CA, pp. 1-9, 2002.

H. Suroor, M. Galagoda, and C. McGhee, "Design and Construction of Circular Secant Pile Walls in Soft Clays," in 6th International Conference on Case Histories in Geotechnical Engineering, Arlington, VA, pp. 1-11, 2008.

N. Sharma, R. Dhyani, and S. Gangopadhaya, "Critical Issues Related to Metro Rail Projects in India," Journal of Infrastructure Development, vol. 5, no. 1, pp. 67-86, 2013.

V. R. Pol and M. S. Ranadive, "Metro Tunneling– A Challenge," International Journal of Earth Sciences and Engineering, vol. 8, no. 2, pp. 313-319, 2015.

S. Ho Cho, J. Kim, J. Won, and M. Kim, "Effects of Jack Force and Construction Steps on the Change of Lining Stress in a TBM Tunnel," KSCE Journal of Civil Engineering, vol. 21, no. 4, pp. 1135-1146, 2017.

X. Haibo, L. Zhibin, and Y. Huayong, "Pressure Regulation for Earth Pressure Balance Control on Shield Tunneling Machine by using Adaptive Robust Control," Chinese Journal of Mechanical Engineering, vol. 29, no. 3, pp. 598–606, 2016.